Check the license
Any contractor building an ADU in California must hold a license from the Contractors State License Board (CSLB). Look the license up on the CSLB's Check a License tool before you sign: confirm it is active, that the name matches the company you're dealing with, and that its bond and workers' compensation coverage are current. A general building contractor (class B) usually builds an ADU.
Get it in writing
A home improvement contract in California must be in writing and include the contractor's name, address and license number, the work to be done, the price and a payment schedule. (Bus. & Prof. Code § 7159) Make sure it also says who prepares the plans, who pulls the permit and what happens if the plans change in plan check.
Payments
- Down payment: no more than $1,000 or 10% of the contract price, whichever is less. (Bus. & Prof. Code § 7159)
- Progress payments: shouldn't get ahead of the work actually completed.
- Pay the licensed contractor directly, by a method you can track.
Permits and inspections
Work shouldn't start before the permit is issued by LADBS. Ask who pulls it and make sure the required inspections are passed before each phase is covered up. See the permit steps.
Design professionals
Permit drawings, structural design and Title 24 energy calculations come from licensed or qualified professionals. A preliminary plan from MyADUPlan is a starting point for that work, not a permit set.